Projects / Life Sciences / Genesis Marina

Life Sciences · Brisbane, CA

Genesis Marina Life Science Campus

Structural engineer of record for a 730,700 SF, three-building laboratory campus on a continuous two-story parking podium — the world's first TRUE Gold certified construction project.

Size
730,700 gross SF, all structures
Location
Brisbane, CA San Francisco Peninsula
Market Sector
Life Sciences Multi-tenant lab + office
Completed
2024
PARADIGM Role
Structural Engineer of Record Ground-up design
Architect / Contractor
SOM / Webcor Owner: Phase 3 Real Estate Partners

Genesis Marina sits between San Francisco and Silicon Valley, purpose-built as a multi-tenant campus for established and emerging biotech companies. PARADIGM was selected by developer Phase 3 Real Estate Partners and SOM following the firm's work on 1 Tower Place and 2 Tower Place in South San Francisco.

Project overview

The campus consists of two five-story buildings and one six-story building, each approximately 125,000 GSF, supported by one continuous two-story cast-in-place concrete parking structure. In total the project comprises 730,700 SF of laboratory, office, restaurant and commercial recreation space, with flexible modular lab layouts that let tenants select equipment and components to suit their research programs.

Each tower uses a structural steel gravity framing system. Lateral support comes from a steel buckling restrained braced frame (BRBF) and steel moment frame "dual system." The parking structure uses cast-in-place concrete gravity framing with concrete shear walls that carry loads from both the steel towers above and the concrete podium itself.

Structural challenge

The site faces San Francisco Bay, Candlestick Point and San Bruno Mountain, and the architectural program depended on keeping those views open through the building perimeter. Conventional perimeter bracing would have blocked them. The buildings also needed to control torsional response during a seismic event while supporting vibration-sensitive laboratory floors.

PARADIGM's solution

PARADIGM recommended locating the diagonal elements of the lateral force resisting system, the buckling restrained braces, at the interior core of each building, leaving the perimeter free for glazing. Steel moment resisting frames were added to create a dual system that controls the torsional response of the towers during ground shaking. The podium shear walls were sized to collect and resolve loads from three independent steel structures above a single continuous concrete deck.

The project was designed and built with a whole-building view of environmental impact and in February 2024 became the first construction project in the world to earn TRUE Gold certification from the USGBC and GBCI for resource use and waste reduction.

Recognition

Awards & press

PROJECT TEAM

Who we worked with

Owner / Developer

Phase 3 Real Estate Partners

Architect

SOM

General Contractor

Webcor

Civil Engineer

BKF

Geotechnical Engineer

Langan

Structural Engineer

PARADIGM Structural Engineers, San Francisco

More Life Sciences work

Related projects

PLANNING A LABORATORY OR RESEARCH FACILITY?

Talk with the structural engineers behind Genesis Marina

Offices in San Francisco, Chicago and Dallas, with Washington D.C. opening Q1 2027. Licensed in 44 states.