Genesis Marina

Exterior view of the Genesis Marina life science campus highlighting steel structural elements.

Location: Brisbane, CA

Partners: SOM, Webcor

Completion Date: 2024

Genesis Marina consists of two, 5-story and one, 6-story buildings supported by one continuous 2-story concrete parking structure. In total, the project consists of 730,700 SF across all of the structures. The 5-story and 6-story buildings all utilize a structural steel framing gravity system and a steel buckling restrained braced frame and steel moment frame “dual system” for lateral support. The braced frames are located at the interior core of the building in order to maximize the dramatic views of San Francisco Bay, Candlestick Point, and San Bruno Mountain while the moment frames assisted in controlling the torsional response of the building during a seismic event. The 2-story parking structure utilizes a cast-in-place concrete gravity system with cast-in-place concrete shear walls supporting loads from both the steel buildings and the concrete structure.

Architectural exterior view of the Genesis Marina campus showcasing advanced structural steel framing systems.
Detailed perspective of the multi-story Genesis Marina life science development and parking structure.
Interior terrace seating and structural design by PARADIGM at the Genesis Marina life science campus.
Modern lobby and structural atrium design by PARADIGM at the Genesis Marina campus.
Exterior courtyard and structural design by PARADIGM at the Genesis Marina campus.
Close-up view of the exterior facade and structural steel bracing at Genesis Marina.

Genesis Marina is located in an area known as Sierra Point and was utilized as a refuse site from the 1960s until the 1980s. The subsurface conditions consist of bay mud below approximately 80 feet of refuse. When Sierra Point was closed as a refuse site, a clay cap was installed across the entire site. This particular site was the last area to be closed and as such, the refuse placed is relatively juvenile in its compression and settlement. Therefore, the structure, like all in the Sierra Point area, is supported by 1760, 190 foot long steel “H” piles which extend thru the clay cap, down thru the refuse and bay mud to bedrock.  The refuse decomposition also creates significant challenges related to site settlements which create unique support conditions for underground piping and conduit which are supported from the ground floor structural slab.

Aerial view of the waterfront Genesis Marina campus designed by PARADIGM in Brisbane.
Scenic waterfront courtyard framing the bay with structural engineering by PARADIGM at Genesis Marina.
Outdoor campus plaza and modern glass building structures engineered by PARADIGM at Genesis Marina.
 
Previous
Previous

Fox Theater

Next
Next

Genesis Towers